Although Dwyt is scheduled for an orientation on Tuesday, June 19, 2012 still I insist to visit our unit together with our contractor kuya Alfred who will be in charge for the renovation. Surprisingly, this is what we found out in our most awaited unit...
|
Cracked Walls all over the Unit, is this a wall decor??? |
|
Rough and Uneven Flooring |
|
Unconnected Pipes and Sloppy Space |
|
Smeared Walls and some cigarette butts on the floor |
|
Lousy Wall Tiling, I can hide my coins here...hahaha |
|
Dirty Floor Tiles and modern sink??? |
|
Inconsistent Color of Tiles, or is this the latest trend now??? |
There's a lot more to show but for now, what can you say about our unit? All these things will be reported to Engr. Edgar right after our orientation, hopefully they can fix this ASAP!
Indeed, it was really a very dissatisfactory visit and a stressful one because aside from the fact that the unit was not completely done, there was this Security Guard who told us that we are not allowed to enter our unit because it's Sunday and the engineer is not available... Meaning, during Sundays we are not allowed to stay in our unit. CRAP!!!